SQL Server Performance Forum – Threads Archive
running replication jobs using scripts
Hi all,We have 2 merge replication jobs. I want to complete one job and then start another job after the first one is completed. Is there any way, then I can schedule the second job so that it starts after the first one is over?
Thanks in advance.
Thanks,
Preeth.
http://www.databasejournal.com/features/mssql/article.php/1438231 fyi. Satya SKJ
Moderator
http://www.SQL-Server-Performance.Com/forum
This posting is provided “AS IS†with no rights for the sake of knowledge sharing.
]]>